Veneto (IT) 2011
Place:
Veneto, Italy (IT)
Year of commissioning:
2011
Kind of application:
Fines recovery unit
Capacity:
100-110 tph of sand

Are you interested in Pozzato plants?
Description
The Pozzato unit installed in Veneto in 2011 has been designed as an alteration to an existing screening and washing plant for aggregates.
A new bucket wheel enable to handle up to 100 tph of sand has been installed, in order to treat the slurry coming from the aggregates washing plant and to recover the particles < 4 mm draining the water in excess.
Furthermore, a new sand washing plant enable to treat up to 110 tph of particles < 4 mm, equipped with an hydro-cyclone and a dewatering screen, has been fitted in order to optimise the fines recovery and to remove silt and clay included in the feeding material.